In preparing to cap a spring, the eye of the spring must be cleaned. On a slope this can be done by digging a trench from the spring and
allowing the water to flow. Clean the eye of all foreign matter, mud, trash, etc. so that the water flows clean. If a trench cannot be dug, the actual eye will have to be cleaned by hand. Remove mud and trash
with buckets or shovels. If the spring is small, a notched plastic pipe can be laid in the trench behind a dam (1/3 meter high) constructed of small rocks and concrete to create a reservoir of water. The reservoir
of water behind the dam is filled with medium size rocks and covered with a plastic sheet. The balance of the hole at the spring eye is covered (filled) with soil to seal and protect the spring. The plastic pipe which is notched only before the dam will have a continuous flow of water. The plastic sheet covering the spring eliminates most surface water from entering the reservoir. Some experienced crews dig another trench for the dam and reservoir next to the spring eye eliminating the necessity of working in the water hole itself. After the construction of the dam, the short distance between the prepared reservoir and the spring eye is opened to allow the flow through the prepared channel. The old channel and spring is filled. If the slope is very steep or the spring has a large flow, it may be necessary to build a spring box. The spring box is made large enough to contain the eye of the spring with an open bottom (or back if on a steep hill). Normally the spring box is a cube less than one meter by one meter by one meter. The walls of the box should be no larger than necessary and covered with a removable top to permit cleaning the box. In this case a larger pipe is positioned to drain off the water during construction of the box and sealed or removed after the project is finished. A smaller pipe of a size large enough to handle the flow of the spring is built into the box just above the drain pipe or bottom of the spring box. To prevent contamination, a trench should be dug across the slope above the spring so that surface water does not enter the system. Also pit latrines, dumps, etc., should not be located up hill above the eye of the spring. |
|
Building a Cement Tank |
|
This procedure uses local materials to build a water tank manually. Tanks can be built from corrugated steel, plastic, bricks, or masonry. Cement (masonry) tanks using bricks or a reusable steel form are cheap, easy to construct and have a life of 20 to 30 years. Large tanks need permanent brick sides with reinforced concrete coats inside and out to seal and strengthen the tank. The 5000 liter reusable steel mold is best fitted in many locations.. |
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Tools: Spades, trowels, hammer, screw drivers, wire cutter, pliers, hoes, buckets, shovel. Reusable form - galvanized steel corrugated pipe (culvert) 1-1/2 meters in diameter, 2 meters long. The corrugated pipe is cut in half to form
two half moons. The cut edges are reinforced with angle irons designed so that the pipe can be bolted or wired back together and collapsed inward for disassembly (see drawings for more detail). Materials for a 5000 liter tank using permanent brick or reusable form --10 bags cement; 1 cubic meter sand; and 1/3 cubic meter gravel. Ratios recommended: 1. For top and base -- one part cement, two parts sand, and three parts gravel. 2. For mortaring or plastering sides and interior of tank--one part cement and four parts sand. 50 x 1200 chicken wire fencing 6 meters long x 2 meters wide for reinforcing concrete;10 kg fencing wire 3.15 mm diameter (for burst strength); 1/2 KG binding wire 1.25mm diameter (for holding and fastening); 6.5mm x 200mm x 200mm concrete reinforcing mesh, 4 meters long and 2 meters wide (for reinforcing base and top). Materials: 3 black plastic bags; wood plank (50mm x 300mm, 2 meters long); 100 meters of plastic pipe (25mm or 40mm diameter); 6 couplings (for 25mm or 40mm diameter plastic pipe); one 20mm tap (faucet); one 20mm galvanized steel pipe one meter long. Construction- The top of the tank must be below the water level of the spring if the tank is to be gravity
fed. A trench 1/2 meter deep should be dug from the spring to the location of the water tank. The tank area should be leveled. A square or round form at least 2-1/2 meters across and 1/4 meters thick can
be constructed out of any material such as scrap wood or steel. The base is reinforced with mesh centered in the concrete. The trench (1/16 meter deep at this point)) ends in the center of the base. A
plastic tube (the inlet) should extend up 1/4 meter above the concrete bottom of the tank. Another plastic tube should be positioned in the base before it is poured and should continue down the slope
several meters from the tank (This is the overflow which supplies water for irrigation and animals.) After the tank is completed, a plastic coupling and tube is added to this overflow pipe to maintain the desired
level in the tank. Provision should be made on the surface of the concrete base for the cast iron pipe outlet and tap at this time. The same method can be used to produce a top. The empty cement paper bags are placed on level ground with a 5 meter piece of plastic tubing joined at the ends for a form. The reinforcing mesh should be laid on the plastic tube and paper bags and then cut to the size of the circle. The top should be as light as possible but strong enough to protect the tank. A form, either reusable or permanent, is erected on the concrete base. A permanent form 1-1/2 meters
in diameter and 2 meters high is made of half bricks with mortar between each layer and each brick. The vertical spaces between the bricks should not line up. The mortar should be allowed to set for two
days. The outside of this brick form is then covered with chicken mesh wire. The fencing wire is looped around the first layer of bricks and twisted tightly together but not cut. The wire is then drawn
continuously around each layer of brick to give the tank burst strength. Once again the 1:4 (cement to sand) concrete mix for plastering is prepared. To achieve the most uniform cement, the sand and the
cement should be mixed dry before adding water. Be careful in adding water - it is a common mistake to add too much. |
|
|
||||||||||||||||||||||
|
Therefore the first layer inside and outside should be very workable and not stiff. Two layers should be applied to both the inside and outside. The first layer on the inside should fill in the inside bottom corner of the tank and extend in part way to the center. The second layer on the inside should cover the inside wall and as much of the bottom as possible. These two inside coats seal the tank and make it waterproof. Each layer of concrete should be allowed to dry overnight. Two layers of concrete plaster should not exceed 35mm per side. It is good to introduce water into the tank as soon as possible to slow down curing; this increases the strength. Be sure that the inside coatings do not cover the overflow the inlet or the outlet pipes. |
|
|
||||||||||||||||||||||||||||||||||
|
One day after the tank is completed, the spring tube in the trench can be coupled to the plastic inlet tube from the tank. The faucet should be connected to the galvanized pipe and the extension to the overflow pipe should be coupled to maintain the water at the maximum level. The tank will appear wet when water is first added. This is because the cement is curing. How to Build a Reusable Form or Mold Materials required - One galvanized corrugated pipe (culvert) 1-1/2 meters in diameter and 2 meters long; 4 angle irons 75mm, x 75mm, 2 meters long (with 10 equally spaced 10mm holes drilled in one side of the angle 62.5mm from the center edge of the angle iron); one 50mm x 150mm hard wood plank 2 meters long; (a) 40 bolts 5mm diameter 50mm long for bolting angle irons to steel pipe forms; (b) 10 bolts 10mm diameter 50mm long; (c)10 bolts 10mm diameter 200mm long. Note: If the two halves are secured together with wire, (b) and (c) can be eliminated. |
|
|
||||||||||||||||||||||
|
To assemble the tank, wire or bolt (10mm x 50mm bolts) the sides with the angles next to the edge together. On the side where the angles are inset 50mm, place the 50 x 150mm wood plank on the inside of the tank between the angles. In this position the form will be separated 100mm. The wall of the form and the wire or the bolts (10mm diameter x 200mm long) will hold the plank in place. This method allows the form to be collapsed inward after the first two layers of cement are troweled on the outside. Plastic is placed over the cracks where the form is bolted together to prevent the cement from bonding to the sides |
|